The Joint Commission emergency management standards sought to make hospital preparedness a formal organizational responsibility rather than a marginal planning exercise. Introduced in 2001, they required emergency command structures and community coordination, but did not ensure that a hospital’s written plan matched its resources or the hazards it faced. The experience of Memorial Medical Center and the contrasting response at Charity Hospital show both the value of preparedness and the distance between accreditation standards and operational readiness.

Development and Purpose

In the 1990s, emergency preparedness occupied little space in hospital accreditation requirements. When the Joint Commission proposed stronger standards for the new millennium, hospital executives objected that they would impose costly obligations without providing funding. The governing board nevertheless approved the proposals, despite including representatives of major industry organizations such as the American Hospital Association and the American Medical Association. The standards took effect in January 2001, nine months before the September 11 attacks.

Their timing mattered. The attacks and subsequent anthrax mailings helped shift hospital readiness toward bioterrorism. By 2005, more than a billion dollars had been made available to the nation’s hospitals for that purpose. Memorial Medical Center’s planning reflected the imbalance: its most detailed emergency scenario was a 101-page bioterrorism plan, while its hurricane plan occupied 11 pages. The standards created a framework for preparedness, but the national focus on particular threats could leave other dangers less thoroughly considered.

Requirements and Limits

The standards required hospitals to establish an incident command system for emergencies and to coordinate plans with the wider community. That requirement recognized that a hospital could not prepare for a flood in isolation if the same event might disrupt citywide power and water. The standards also called for an annual assessment of vulnerability to a range of hazards.

Yet they did not specify how realistic an emergency plan had to be. Their broad language allowed differing interpretations, and surveyors generally did not verify whether hospitals possessed the staff, equipment, or other resources needed to execute the plans they submitted. The standards went beyond federal requirements, but a hospital seeking to avoid the Joint Commission’s mandates could pursue accreditation elsewhere. Formal requirements therefore raised expectations without reliably testing whether preparedness existed in practice.

Memorial Medical Center’s Self-Assessment

At Memorial Medical Center, Susan Mulderick’s emergency preparedness committee used a free, three-page template to assess about 47 hazards, ranging from volcanic eruptions to malfunctioning fire alarms and an undefined VIP situation. The committee evaluated the hospital’s own probability, risk, and preparedness scores while under pressure to control costs; the latest matrix contained numerous multiplication errors. It rated preparedness for power outages, generator failure, and floods as good, the highest category, even though committee members later said they had focused more on emergencies that had occurred than on the worst that could happen.

The gap was not simply a matter of overlooking an abstract risk. After Hurricane Ivan’s near miss in 2004, hospital engineer Eric Yancovich studied storm-surge models and calculated that flooding of less than four feet on Magnolia Street could send water over the loading dock. Although the backup generators themselves were on the second floor, parts of the emergency power distribution system were at or below ground level. Yancovich warned that little water could disable most of the medical center and predicted that patients might have to be moved to the Clara Wing. He recommended raising transfer switches and pumps supplying medical air and vacuum suction, but a partial bid for electrical work exceeded a quarter of a million dollars; his memo cited the lack of capital and deferred approval.

When Hurricane Katrina approached, the vulnerability had not been remedied. Across New Orleans, all but two of roughly a dozen and a half hospitals had generators, electrical switches, or both at ground level. The city’s evacuation difficulties compounded hospital exposure: residents without cars faced inadequate transportation, ambulances were trapped in traffic, and some patients were taken to the Superdome rather than out of the city. These conditions illustrate why community coordination mattered in the standards, while also showing that a requirement to coordinate did not itself create sufficient transport or a workable evacuation system.

Contrasting Preparedness and Wider Significance

Charity Hospital provides a counterpoint to Memorial’s planning record. Although Charity flooded and lost power, plumbing, computers, telephones, and elevators, its staff continued caring for patients until the evacuation was completed on September 2, a day after Memorial’s transfer. The public hospital had prepared for a Category Three hurricane and levee failure, acquired portable generators, oxygen-powered ventilators, and a ham radio system with federal preparedness funds, and trained security officers for disaster conditions. Staff siphoned gasoline from cars to run ten small generators that powered intensive-care ventilators and cardiac monitors, including equipment supporting a very premature baby. At Memorial, patients instead had to be ventilated by hand after the power failed; two similar generators were later used for lights and fans rather than medical equipment.

Charity’s response also involved practices beyond purchasing equipment. Leaders held meetings every four hours, staff maintained ordinary routines where possible, and workers were told to report only what they had personally seen. Most consequentially, Charity did not designate a group of patients as too ill to rescue: it evacuated the sickest first, rather than last. The comparison does not establish that accreditation standards alone determined either hospital’s outcome. It does show that readiness depended on concrete capabilities, reliable assessment, communication, and decisions about patients—not merely on having a plan or receiving a favorable preparedness score.

The standards’ enduring significance lies in that distinction between formal compliance and demonstrated capacity. Later observers of hurricane planning saw a more organized hospital command center offering assistance beyond its own facilities, yet staff still had not considered the complete failure of backup power. Emergency standards can structure planning and encourage coordination, but they cannot substitute for testing the assumptions beneath a plan, investing in vulnerable systems, or preparing for the failure of the backup to the backup.